Reducing the size of the building has allowed its most important elements to be kept; bringing it back into use has ensured its survival in the longer term.
Local Digital Format (Rank: 0)
case-study-selective-demolition-duns-primary-school.pdf (620.10 kb)
Case Study: Selective Demolition Duns Primary School