Refurbishment Case Study 12

This case study describes the installation and running of a biomass system at Kincardine Castle.

This report is the twelfth in a series of Refurbishment Case Studies which describe energy efficiency upgrades in traditional Scottish buildings. While the previous case studies have focused on work to building fabric, this study describes the installation and running of a biomass system.

Refurbishment Case Study 12

Key Selling Points


Authors


Formats

Local Digital Format (Rank: 0)

refurb-case-study-12.pdf (1.61 mb)

Refurbishment Case Study 12

Related Documents


Related Grants